Data Centre
![]() |
Global Payments Processing Business, Data Centre Fit Out Design and Build JCA were asked to complete the design and construction of an internal fit out of a tier III + data centre for a global payment processing company, as defined by the Uptime Institute of America’s tier classification and performance standard (UTI), supported by TIA 942… |
![]() |
Global Payments Processing Business, Data Hall Design and Build/UPS Upgrade Our client, a global payments processing business, appointed us to convert an existing space into a new data hall and replace the existing UPS system… |
![]() |
Talk Talk Technology, Milton Keynes, Breckland Critical Infrastructure Project JCA were asked to carry out extensive capital plant replacement and upgrade work on a 20+ year data centre facility. The works were to be carried out in a live environment with no loss or impact to the client’s services… |
![]() |
Norwich Union, DC3 Working closely with the HD rack manufacturer, JCA were appointed to deliver the design, coordination, installation and commissioning, inclusive of a full heat load test, of the largest high density deployment of its time in Europe…. |
![]() |
SQ17 Phase 1 Data Centre Design and Build JCA were asked to complete the design and construction of a tier III data centre for Ark Continuity Ltd, as defined by the Uptime Institute of America’s tier classification and performance standard (UTI), supported by TIA 942…. |
![]() |
Ark Continuity, A9 Phase 1 Data Centre Design and Build JCA carried out the rapid deployment of a low PUE data centre, with a 1 MVA power supply serving one data suite along with its associated administration and ancillary support areas… |
![]() |
Ark Continuity, P1 Module 1 Data Centre Design and Build The principal of the electrical engineering services design and build, instructed by our client, is to provide a Tier III concurrently maintainable main electrical site infrastructure and power delivery system… |
![]() |
Global Information Provider, London Docklands Our client, a global information provider, asked us to supply and install a second power supply supporting critical services in their Docklands data centre, while maintaining the power at all times. |